The desks are in place and the Wi-Fi connects. Then someone tries to take a customer call or print an invoice. Those are the moments your office IT move checklist needs to account for. Plan backward from the first working morning: which people must complete which jobs, and what needs to be ready for them to do it?
Start With Monday Morning, Not the Equipment Order
Ask each team to name one ordinary task that needs to work when the doors open. Keep the answers specific. "Run the business" is too broad; "open a customer record and issue an invoice from the reception desk" gives the move team something to test.
List the application, device and any attached equipment involved. Note location-dependent settings, including access that relies on the old office's network address. Have IT confirm those dependencies before the move.
Decide what staff should do if a task isn't ready. A temporary approved workspace or a planned delay may be a reasonable fallback. Communicate it before opening day so people aren't trying to solve the same problem independently.
Get Into the New Space Early
Check where the internet service enters, where equipment can be secured and whether desks and printers have suitable power and network connections. Look at the actual rooms; a floor plan won't tell you about a locked cupboard or a cable route that needs permission.
Ask who is responsible for building access, carrier work and any landlord approval. Record installation and acceptance dates separately. A confirmed order is useful, but it isn't evidence that the new connection is working.
Keep the old service until the agreed cutover conditions are met. Put someone in charge of that decision so cancellation doesn't happen simply because the moving date arrived.
Make the Equipment Understandable to the Next Person
Before disconnecting, label devices and their destinations. Keep approved connection photos and setup notes without exposing passwords or customer information. Record who is responsible for sensitive equipment during transport.
Confirm the backup and recovery arrangements for systems holding business data. Keep the instructions accessible somewhere other than the equipment being moved. The person reconnecting the server shouldn't have to find the recovery notes on that same server.
A useful move-day note might say:
Reception workstation goes to desk R1. Test incoming calls, the customer application and the invoice printer before reception opens. [Person] confirms the result; [IT contact] handles a failed test. Temporary working method: [approved arrangement].
Let the People Doing the Work Sign Off
Once connected, have users work through the opening-day tasks. Test incoming and outgoing calls, printing and scanning separately. A successful browser session doesn't establish that every piece of equipment works.
Keep the acceptance list visible:
- Task and person testing it.
- Expected result and what actually happened.
- Owner and next action for any failure.
- Decision on whether staff can use the normal process.
After the new office is accepted, collect the remaining equipment, remove obsolete access and confirm which old services should end. Keep the opening-day task list alongside the floor plan. Those two documents give the move team a clear definition of ready.
Reference and Next Step
FTC: Cybersecurity for Small Business. Reference checked November 15, 2026. The checklist above is a suggested operating process to adapt to your environment.
Contact NHM Ohio about your checklist.